All guides
Manufacturing·3 min read·November 29, 2026

How Do You Write Makeup Brush Acceptance Criteria into the Contract? An Inspection Checklist Covering Appearance, Bristles, Joints and Packaging

How to write acceptance criteria into the contract: an inspection checklist for appearance, bristles, joints and packaging, what to inspect in every batch, and the three clauses every contract must include.

How Do You Write Makeup Brush Acceptance Criteria into the Contract? An Inspection Checklist Covering Appearance, Bristles, Joints and Packaging

After you place an order with a makeup brush OEM factory, what you fear most is usually not a delayed delivery — it's discovering problems only when the goods arrive. Shedding bristles, loose ferrules, cracked handles, blurry printing: all of these can be spotted before shipment, but if the acceptance criteria aren't written into the contract, the factory may not take responsibility.

This article explains how to write acceptance criteria into the contract, what to inspect in every batch, what to do when goods fail inspection, and the three clauses that must be in the contract. Once you've read it, you'll be able to agree the acceptance criteria before placing the order — and avoid a lot of wasted effort.

1. Why Acceptance Criteria Must Be Written into the Contract

Many people think acceptance just means "take a look when the goods arrive", but acceptance is actually a set of standards. Without standards, there is no basis for a claim.

The acceptance criteria in a contract should cover at least four areas: appearance, bristles, joints and packaging.

Appearance covers bristle length, ferrule length, handle colour, and print position and clarity.

Bristles cover density, softness, powder pickup and shedding rate.

Joints cover the joint strength between the ferrule and the bristles, and between the ferrule and the handle.

Packaging covers the packaging method, lining, dividers and protective materials.

If acceptance criteria aren't written into the contract, the factory may not recognise them — because the factory's standards may differ from yours.

2. What to Inspect in Every Batch

When each batch arrives, inspect at least five things.

First, appearance: do the bristle length, ferrule length, handle colour, and print position and clarity match the signed-off sample?

Second, bristles: do the density, softness, powder pickup and shedding rate meet the standards? The shedding rate is the key point — test it in practice.

Third, joints: do the joint strength between the ferrule and the bristles, and between the ferrule and the handle, meet the standards? Pull and twist them in practice.

Fourth, packaging: do the packaging method, lining, dividers and protective materials match the contract?

Fifth, quantity and documents: is the quantity correct, are the inspection reports complete, and are the material certificates in order?

At inspection, use sampling rather than inspecting every piece. The sampling ratio should be written into the contract — for example, inspecting 5% or 10% of each batch.

3. Writing Acceptance into the Contract

Acceptance criteria written into the contract should include at least three parts: the inspection items, the inspection methods and the acceptance standards.

The inspection items are what is inspected — for example, bristle length, shedding rate and joint strength.

The inspection methods are how it is inspected — for example, measuring with a ruler, testing with a pull gauge, or visual inspection.

The acceptance standards are the acceptable range — for example, bristle length tolerance of ±1mm, shedding rate below 1%, and joint strength reaching a stated number of newtons.

The contract should also state clearly what happens when goods fail inspection: return, replacement or a price reduction? Who pays the freight? How long is the repair time?

Agree all of this in advance and write it into the contract. Don't wait until a problem arises to negotiate it.

4. Three Clauses That Must Be in the Contract

Besides the acceptance criteria, the contract should also contain three clauses.

First, mould ownership. Who owns the mould? If you change factories, can the mould be taken away? Who pays for mould maintenance?

Second, specification changes. Who can propose a specification change? Who pays for the change? Does a specification change require new sampling?

Third, spare-parts supply. How long will spare parts be supplied? How is the spare-parts price calculated? What is the spare-parts lead time?

These three clauses are the easiest to overlook, but the most important when a problem arises.

Conclusion

Acceptance criteria are not about taking a look when the goods arrive — they are a set of standards written into the contract. Appearance, bristles, joints and packaging: every batch must be inspected. What happens when inspection fails, mould ownership, specification changes and spare-parts supply — all of this should be agreed in advance and written into the contract.

Before placing an order, ask the factory three questions: can the acceptance criteria be written into the contract, what is the sampling ratio, and what happens when goods fail inspection? Once those three points are clear, your order will go much more smoothly.

Need a tailored quote?

23+ years of OEM experience since 2003, MOQ from 500, free 3D mockup within 24 hours.

Talk to our team